How to save 10 times cost on wearing spare parts?

We have the most original spare parts drawing,with our good quality materials,can help you to save your cost by about 10 times comparing with original spare parts. Why don’t you have a try about our spare parts? We will satisfy you  100%.

AI,SMT wearing spare parts ,like UIC AI parts, Fuji,Samsung,Juki,YAMAHA and so on ,nozzle,feeders.

SMT,THT,PCB,PCBA,AI,wave soldering,reflow oven,nozzle,feeder,wave soldering,PCB Assembly, LED, LED lamp, LED display,

How to solve the problem of long lead insertion welding ?

S-DS300 Automatic dip soldering machine

S-DS300 Automatic dip soldering machine low  to 2 KWH per hour  8 hours oxide: do not need to be selective price below 0.2 KG  ,don’t need high operating cost of wave soldering, do not need artificial control quality, simply S-DS300 intelligent automatic welding machine,  long lead insertion welding , no need to ask for ways http://buyinglevitrahere.com from others from now on!!

 Contrast to high wave soldering, energy saving operation cost nearly $28000USD one year
* Contrast to double wave soldering, save running cost $15ooo USD each year
 

Want effect, but also the high grade, the price also does not need expensive, only we can help you!!!!!

  

Are you looking for machine instead of worker to assembly your PCB

Are you still using manual insertion to assembly your PCB? We design and manufacture auto insertion machine,SMT equipment, and providing spare parts support.

Worldwide Installation and on site support.
Factory (machine and lighting assembly) training.

Upgrade your old Universal Auto Insertion Machine to AC motor

We provide spare parts for Panasert, Universal,TDK, Dynapert and Sciencgo Auto Insertion machine, SMT equipment.

Worldwide 7×24 service online support.

  • saving your purchasing cost, decrease 50%.
  • fast delivery
  • total service support

Saving 50% Auto Insertion machine Spare Parts cost

We provide full supporting to all Auto Insertion machine, not only Universal, Panasert, TDK, Dynapert, Sciencgo. but also spare parts, retrofit, upgrade,maintenance,overhaul.

SMT,THT,PCB,PCBA,AI,wave soldering,reflow oven

Universal Inserter Loader And Unloader Automation Transformation

Universal Inserter Loader And Unloader Automation Transformation

*Reduce the operator labor intensity 

*Reduce the equipment efficiency loss caused by operator sabotage 

*Save operators, one person can operate several machines. 

*Can the attachment (In – line) SMT production line. 

*A more secure protection operation. 

*Automatic production mode. 

  

Manual loader and unloader                    Automatic loader and unloader(material box model)

The content of the technical 

Technical renovation project mainly includes four modules setup and training: 

1.Bridge type automatic institution adapted for changing plate 
2.Container loader and material box unloader 
3.Electric control circuit 
4.Software Settings. 

 5.Training                                                                      
*Training operation for operator 
*Maintenance engineer training 

The implementation steps 

Technical renovation engineering installation and debugging need about 1.5 days 
Operation training and maintenance training need 0.5 days 

Component installation project include: 
1.Installation of bridge type automatic agency for changing board

    

                   Lift bridge components 

2.Rotary worktable PCB fixture from stationary orbit type 

      

                   Fixed clamp                                                                                 Rail clamp 

The implementation steps 
3.Installation  material  box  loader and unloader machine

                                

4.Electric control circuit 

                                                         

5.Software Settings. 

Customers give evaluation is: stable and reliable, simple and easy to use and cost-effective